| Industry | Hardware Retail |
|---|---|
| Region | North America |
| Timeline | 9 Months |
| Output | 40,000 Units / Year |
A retail chain wanted to launch a private-label cordless platform without in-house engineering. VOLTRIX delivered the complete cycle: concept, prototype, certification, production and retail-ready packaging.
Stage 1 — Concept & Prototype
Ergonomic studies and battery-platform planning produced three prototype generations in 10 weeks. Each generation was reviewed with the client's merchandising team to balance cost and shelf appeal.
Stage 2 — Validation
Lab testing covered drop, dust, water ingress and 200-hour endurance runs. Field testing with 30 professional users drove two final design refinements.
Stage 3 — Launch
The platform launched across 400 stores with a shared 20V battery system — a key retail differentiator — and exceeded first-season sales forecasts by 35%.
